Monday, September 12, 2011

Shower Progress

While I was at class on Friday, Dad put the quarter round trim around the edges of the tile of the shower.  Saturday, we grouted the tiles and installed the window.  We also got the fixtures in place.  Sunday, we installed the shower door.  It's really coming along.  Now, we just need to finish the wall above the tile.  We've smoothed it out with joint compound.  It still needs to be textured and painted.

No comments:

Post a Comment