Sunday, June 12, 2011

Only Two Days of Work This Weekend

We worked only Friday & Saturday this weekend.  Sunday we celebrated Father's Day early as Mom and Dad will be out of town next weekend.

Floorman came out Friday morning and measured the three rooms for carpet.  It should be getting installed about the 24th - it's got to be made then shipped.

Friday, the living room window was replaced.  Saturday, Mom flashed it.  Dad put chicken wire around both the front windows so he can stucco them later.  That took up just about most of the day.  Cutting and stuffing it around the window is a slow, slow process.  Window sills around both windows have been installed and need to be joint compounded and painted.

I got some weeding in the front done.  Also, some trim and cabinet door painted.  Mom added some sheetrock to the short parts of the bedrooms.  In some places, the sheetrock doesn't come down all the way and would leave a gap between the wall and carpet.  Since I'm not planning on putting baseboard in them, I definitely want that gap gone.  I taped and Mom compounded the additions.

We're getting there.

No comments:

Post a Comment