The first half of the day was spent at the store. I had a 10% off coupon that needed to be used soon. I got all of this: one more kitchen cabinet, 4 windows, a patio door, 20 light bulbs 8 table legs and hardware, finish nails, screws, a vent register, and brown paint.
After lunch, Mom continued cleaning up ceiling trim so that she can install it tomorrow.
Dad and I started working on the hall floor. First, we had o cut off the door jambs so the laminate would slide underneath. That was a bear of a job that wore us both out - thankfully we only had to do three, two had been done previously.
I got the foam/moisture barrier put down the length of the hall. Dad put the spacers against the wall. We're ready to lay the floor tomorrow morning.
No comments:
Post a Comment